Get the right building control approval in England

Check approval before construction, conversion or relevant alterations.

England · Current guidance

Checked 20 October 2026. Review due 19 November 2026.

Planning permission and building regulations approval serve different purposes. Some work can be self-certified by a registered competent person. Keep the evidence for the route actually used.

Check whether the work needs approval

Describe the actual alteration and intended use to the relevant building control body.

  • Identify structural alterations, extensions, conversions, controlled services and changes affecting fire or energy performance.
  • Check planning permission, listed-building consent, lease restrictions and party-wall issues separately where relevant. Building approval does not answer all of them.
  • Establish whether the building falls into the higher-risk regime and whether the Building Safety Regulator is the relevant authority.

Plan design, notification and inspection

Agree the route and required information before the contractor starts.

  • Keep drawings, specifications, structural calculations and the responsibilities of the client, designers and contractors clear.
  • Confirm inspection stages and notice requirements. Arrange access before foundations, structure, insulation or drainage are covered.
  • Check which work can use an applicable competent-person scheme and retain the correct compliance documentation. A trade qualification alone does not establish scheme notification.

Complete and preserve the file

The contractor finishing on site is not the final approval record.

  • Resolve inspection issues, submit required declarations or information and obtain the appropriate completion evidence.
  • Collect commissioning, electrical, gas and other specialist documents for the actual work. Match certificates to the property and installation.
  • If approval was missed, ask the local authority about the appropriate route and its limits before marketing the altered accommodation as approved.

Example: removing a wall seems straightforward

A fictional contractor says an internal wall can be removed in a day. First establish whether it supports loads or affects escape, fire separation or services. Obtain the necessary design and approval before demolition, not after a beam has been installed.

What to do

  1. Describe the work and identify the proper approval route.
  2. Check planning, listed-building and lease restrictions separately.
  3. Obtain inspections and completion or compliance certificates.

Evidence to keep

  • Plans, approval and inspections
  • Completion or competent-person certificate

Sign in to use your Rentura records, save evidence and keep track of follow-up work.

Sources and guidance

Related guides

General information, not legal advice. Use the official source for the full scope and exceptions. Read our source and correction policy. You can print this page using your browser’s print option.