Rentura

Respond to Scottish damp and mould reports

From 6 October 2026: investigate within 10 working days, then provide a summary within three working days.

Scotland · Current guidance

Checked 20 October 2026. Review due 19 November 2026. Effective date discussed: 6 October 2026.

If substantial damp or mould requires repair, begin work within five working days of the investigation ending. Private landlords must complete it as soon as reasonably practicable. The 20-working-day completion maximum described for social landlords is not the private-landlord rule.

Start the clock from awareness

Record when the landlord or their representative first became aware of the problem. Do not wait for a formal complaint form before opening the case.

  • Keep the original report, photographs and affected rooms. Ask about the extent, active leaks and any occupant needs relevant to urgency.
  • Calculate the working-day deadlines using the applicable guidance, with weekends and relevant holidays handled correctly. Keep the calculation visible to the person managing the repair.
  • An emergency or serious immediate risk may require faster action. A maximum investigation period is not permission to leave an obvious danger unattended.

Investigation, summary and work

The duties include distinct events. Record each event separately so a contractor booking does not get mistaken for completed investigation or repair.

  • Investigate within 10 working days of awareness and provide the required written summary within three working days of the investigation ending.
  • Where the investigation identifies the relevant substantial damp or mould problem, begin the required repair work within five working days of the investigation ending.
  • For private landlords, complete the work as soon as reasonably practicable. The separate 20-working-day completion rule discussed for social landlords must not be copied into a private-landlord deadline.

Delays and follow-up

If work cannot proceed as planned, document the actual reason and use the guidance on exceptional circumstances and interim measures.

  • Record access attempts, specialist availability, drying needs or dependencies with evidence. Explain the revised plan and next update to the tenant.
  • Consider what protection or arrangements are needed while the affected room remains unsafe or unusable. Do not treat sending an update as a substitute for work.
  • Verify the cause was addressed and revisit recurrence. Retain the investigation summary, start date, completion evidence and tenant communication together.

Example: the investigation finishes before the report is typed

A fictional inspection establishes a substantial damp problem on Monday. Record the actual investigation-end date and calculate the summary and work-start deadlines from the appropriate event. Do not move that date to Friday merely because that is when the contractor finishes typing the report.

What to do

  1. Record when you became aware of the problem and assess immediate risk.
  2. Arrange a competent investigation and send its written findings.
  3. Record repairs, reasonable interim measures and any properly explained exceptional delay.

Evidence to keep

  • Original report and investigation dates
  • Findings, tenant summary and repair records

Sign in to use your Rentura records, save evidence and keep track of follow-up work.

Sources and guidance

Related guides

General information, not legal advice. Use the official source for the full scope and exceptions. Read our source and correction policy. You can print this page using your browser’s print option.

Knowledge base · Renting rules by country · Terms · Privacy · hello@rentura.co.uk