Check Welsh building approval before conversions

Converting a house into flats or bedsits requires building regulations approval.

Wales · Current guidance

Checked 20 October 2026. Review due 19 November 2026.

Use Welsh approved documents and the relevant building control authority. Planning use, HMO licensing and building regulations are separate checks. The new Welsh building control regime has transitional arrangements from 1 July 2026.

Describe the proposed work accurately

Give building control a clear scope, floor plan and intended use. The approval route can depend on the building and the type of alteration.

  • Identify structural work, fire precautions, drainage, insulation, ventilation and any conversion into separate homes. A project described only as refurbishment may conceal controlled work.
  • Check planning permission, conservation or listed-building constraints separately. A planning decision does not approve the building-regulations detail.
  • Establish the applicable Welsh building control regime and transitional position, including the changes beginning on 1 July 2026 where relevant.

Agree the route before starting

Confirm the application or notice, responsible people, information needed and inspection stages with the appropriate building control body.

  • Keep drawings, specifications and structural calculations under version control. Give the contractor the approved or agreed version.
  • Arrange inspections before work is covered up, including structural connections, drainage, insulation and fire stopping where relevant.
  • Ask what approval is needed for a change during the work. Do not let a contractor replace a specified detail without checking its effect.

Obtain completion evidence

Practical completion and building control completion are different records.

  • Keep inspection findings and resolve outstanding items. Obtain the relevant completion or final documentation and retain it with the property.
  • Collect electrical, gas, fire and other specialist certificates appropriate to the work. Confirm they identify the correct dwelling and scope.
  • If historic work lacks approval, discuss the available regularisation or other route with the council before describing it as compliant. Opening up or further work may be needed.

Example: a house is divided into flats

A fictional owner proposes two self-contained flats. Check planning, the material change of use, fire and sound separation, services and the Welsh building control route before work. A new council-tax entry for each flat is not evidence of building-regulations approval.

What to do

  1. Describe the proposed use and physical work to building control.
  2. Check planning, licensing and any freeholder consent independently.
  3. Keep approved plans, inspection records and completion documents.

Evidence to keep

  • Written approval and applicable regime
  • Plans, inspections and completion evidence

Sign in to use your Rentura records, save evidence and keep track of follow-up work.

Sources and guidance

Related guides

General information, not legal advice. Use the official source for the full scope and exceptions. Read our source and correction policy. You can print this page using your browser’s print option.